Air Graffiti Wall Setup Checklist

Updated 5 days ago · 1 min readBeginner

Use this checklist to assemble the Air Graffiti Wall and prepare the booth for software configuration.

Prepare the Space

Choose a stable, level area with enough room for guests, staff, and accessories. Keep power cables away from walkways and avoid placing the booth where guests will bump into it.

Assemble the Hardware

Set up the main booth body, mount the camera or iPad if applicable, connect power, and attach any included display, lighting, or controller accessories.

Connect Accessories

Connect any printer, display, or sensors. Label cables if the booth will be managed by multiple operators.

Preflight Check

  • Hardware is stable.
  • The device is powered.
  • The camera is connected.
  • The internet is available.
  • Printers and sharing options are ready, if used.

Was this helpful?

Related articles